The plant includes the water supply system from the biological purifier, stored in the basin consisting of three tanks for a total capacity of approximately 7500 cubic meters.
The works carried out essentially consisted in the construction of the sand filtering system, including the raw water backup filter, and the chemical conditioning of the raw water, the fire fighting water and the filtered water circuits.
The new plant is powered by a new electrical power system.
The management of the new system is based on a new automation system interfacing with the existing control system.